642-902 ROUTE Exam Topics
Implement an EIGRP based solution, given a network design and a set of requirements
• Determine network resources needed for implementing EIGRP on a network
• Create an EIGRP implementation plan
• Create an EIGRP verification plan
• Configure EIGRP routing
• Verify EIGRP solution was implemented properly using show and debug commands
• Document results of EIGRP implementation and verification

Implement a multi-area OSPF Network, given a network design and a set of requirements
• Determine network resources needed for implementing OSPF on a network
• Create an OSPF implementation plan
• Create an OSPF verification plan
• Configure OSPF routing
• Verify OSPF solution was implemented properly using show and debug commands
• Document results of OSPF implementation and verification plan

Implement an eBGP based solution, given a network design and a set of requirements
• Determine network resources needed for implementing eBGP on a network
• Create an eBGP implementation plan
• Create an eBGP verification plan
• Configure eBGP routing
• Verify eBGP solution was implemented properly using show and debug commands
• Document results of eBGP implementation and verification plan

Implement an IPv6 based solution, given a network design and a set of requirements
• Determine network resources needed for implementing IPv6 on a network
• Create an IPv6 implementation plan
• Create an IPv6 verification plan
• Configure IPv6 routing
• Configure IPv6 interoperation with IPv4
• Verify IPv6 solution was implemented properly using show and debug commands
• Document results of IPv6 implementation and verification plan

Implement an IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements
• Create a redistribution implementation plan based upon the results of the redistribution analysis
• Create a redistribution verification plan
• Configure a redistribution solution
• Verify that a redistribution was implemented
• Document results of a redistribution implementation and verification plan
• Identify the differences between implementing an IPv4 and IPv6 redistribution solution

Implement Layer 3 Path Control Solution
• Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
• Create a Layer 3 path control verification plan
• Configure Layer 3 path control
• Verify that a Layer 3 path control was implemented
• Document results of a Layer 3 path control implementation and verification plan
• Implement basic teleworker and branch services
• Describe broadband technologies
• Configure basic broadband connections
• Describe basic VPN technologies
• Configure GRE
• Describe branch access technologies


642-813 SWITCH Exam Topics
Implement VLAN based solution, given a network design and a set of requirements
• Determine network resources needed for implementing a VLAN based solution on a network
• Create a VLAN based implementation plan
• Create a VLAN based verification plan
• Configure switch-to-switch connectivity for the VLAN based solution
• Configure loop prevention for the VLAN based solution
• Configure Access Ports for the VLAN based solution
• erify the VLAN based solution was implemented properly using show and debug commands
• Document results of VLAN implementation and verification

Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
• Determine network resources needed for implementing a Security solution
• Create a implementation plan for the Security solution
• Create a verification plan for the Security solution
• Configure port security features
• Configure general switch security features
• Configure private VLANs Configure VACL and PACL
• Verify the Security based solution was implemented properly using show and debug commands
• Document results of Security implementation and verification

Implement Switch based Layer 3 services, given a network design and a set of requirements
• Determine network resources needed for implementing a Switch based Layer 3 solution
• Create an implementation plan for the Switch based Layer 3 solution
• Create a verification plan for the Switch based Layer 3 solution
• Configure routing interfaces Configure Layer 3 Security
• Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
• Document results of Switch based Layer 3 implementation and verification

Prepare infrastructure to support advanced services
• Implement a Wireless Extension of a Layer 2 solution
• Implement a VoIP support solution
• Implement video support solution

Implement High Availability, given a network design and a set of requirements
• Determine network resources needed for implementing High Availability on a network
• Create a High Availability implementation plan
• Create a High Availability verification plan
• Implement first hop redundancy protocols
• Implement switch supervisor redundancy
• Verify High Availability solution was implemented properly using show and debug commands
• Document results of High Availability implementation and verification